BIM(Building Information Modeling) Utilization
-
The use of BIM data can be utilized according to the purpose of each subject in the design, construction, and maintenance stage.
Sheet
-
Drawing and creation from BIM data.
-
Drawing is changed by modifying BIM data, such as design change.
-
Can improve errors in drawings.
Analysis
-
BIM data is used as energy analysis and structural analysis data.
Process Management
-
Schedule control is carried out during the construction phase by utilizing BIM data.
-
Applicable to execution management at the construction stage.
Quantity
-
Review of the quantity of structures and finishes in the BIM data.
-
Quantity is automatically changed by modifying BIM data, such as design change.
-
Comparable to the quantity of written statements.
Interference
-
BIM data management through inter-ference check during the design phase.
-
Pre-examination of interspecies inter-ference in the construction stage.
-
Design and construction errors can be prevalidated.
Maintenance
-
Available for maintenance using BIM data.
-
Create and utilize BIM data required for maintenance purposes.