BIM(Building Information Modeling) Utilization

  • The use of BIM data can be utilized according to the purpose of each subject in the design, construction, and maintenance stage.

Sheet

  • Drawing and creation from BIM data.

  • Drawing is changed by modifying BIM data, such as design change.

  •  Can improve errors in drawings.

Analysis

  • BIM data is used as energy analysis and structural analysis data.

Process Management

  • Schedule control is carried out during the construction phase by utilizing BIM data.

  • Applicable to execution management at the construction stage.

Quantity

  • Review of the quantity of structures and finishes in the BIM data.

  • Quantity is automatically changed by modifying BIM data, such as design change.

  • ​Comparable to the quantity of written statements.

Interference

  • BIM data management through inter-ference check during the design phase.

  • Pre-examination of interspecies inter-ference in the construction stage.

  • ​Design and construction errors can be prevalidated.

Maintenance

  • Available for maintenance using BIM data.

  • Create and utilize BIM data required for maintenance purposes.